4 cavity PVC electrical tube, water supply pipe extrusion line can extrude four pipes at same time on one machine . This line can save investment cost in factory building and production,which increase the capacity a lot and reduce production time.SJSZ65 conical twin-screw extruder can easily reach 5.5-6.5ton/per day , the production speed take 16mm as example can get more than 8-10m/min.
The whole line is composed of conical twin screw extruder Φ65mm,4cavity mould,4cavity cooling calibration tank,4 station haul-off,4 station cutter,and 4 station tipping table.
Main Technical Parameter
1,Suitable dai:Φ16-Φ32mm
2,Four station haul-off:up-down two caterpillar tracking