2. Unfold the air rail, find the valve and select the appropriate air nozzle.
3. Align the air nozzle with the valve to inflate.
4. Hold the middle of the valve with your hand to keep the airway open. 5.When the inflation reaches saturation level, it is necessary to cover the air plug in time.
6. Press the air plug into the valve by hand to prevent air leakage.