Construction pile machine is using for Power facilities construction, road construction, construction of buildings and plantting trees.can digging hole at diameter of 300-1200mm, deepth <6000mm. well design and with high efficiency, digging 2meters in 1 minute.easy operate, one people can drive it well. can vertical a pole in 2minute with help by 2 other people(handle the balance of pole when it's be lifting by crane that equipment on hydraulic auger ),
Working principle
Construction pile machinedrill below 6 meters deep equipment with 7 founctions for choose :digging ,ditching,etc.suitable for building fast into the hole in foundation engineering construction machinery. professional design screw
drill ,can working well on very kinds of layer, also include the pebble soil.
Factory working
Construction pile machineto a previous single, many ills material repeat the manpower and financial resources
waste, integrating multiple functions, widely used in the electric power telecommunications, municipal engineering, green wire rod plant trees, construction pit digging, pole, ditching, line laying, back-filling bulldozing, winch traction and 3-6T object lifting, is individual and unit of the preferred ideal construction equipment.
Application
Power Engineering in the construction of cement wire rod hole drilling, solar panel bracket of solar photovoltaic power generation in engineering drilling machine, and the spiral pile, pile construction, the street lamp rod pit drilling.